Challenges:
The size of the project coupled with the tight timeframe resulted in various challenges for the contractor, Bravada Building Services. Firstly, the contractor was given only seven weeks to complete the pool refurbishment project, which is located between Spotlight and Anaconda in the Spotlight Retail Centre. In all, nine different ARDEX products were used, including 570sqm of WPM 002 Waterproofing Membrane and 540sqm of X 17 tile adhesive, FG 8 grout on the pool surrounds, change rooms, foyer and mosaic walls. Also used was 285sqm of WPM 405, an ARDEX additive that enhanced the strength of the screed.
ARDEX products were selected as they are completely compatible, easy to use, as well as being supported by a dedicated Technical Support Team and manufacturer’s guarantee.
Problem:
Bravada Building Services were confronted with a significant challenge as the pool surround was quiet shallow for the screed (minimum thickness and achieving minimum fall requirements 1:100). Due to the thickness issues and the Scyon installation patterns, Bravada Building Services decided to use a self-supporting screed which included a slip sheet with expanded metal reinforcing. ARDEX WPM 405 additive was also used to increase the compressive strength, ultimately giving the contractor’s peace of mind.
The tiling also resulted in a challenge due to tile choices and the layout of patterns. However, the reliability and consistency of ARDEX X 17 tile adhesive provided the contractors with the confidence they needed. ARDEX X 17 was installed in multiple locations and environments such as the pool deck surround, change rooms, showers and foyer areas.
Solution
With a project of this magnitude and complexity it was crucial that all products and techniques selected were not only suitable for the environment but were also compatible. Given the confidence in the ARDEX range of products, Bravada Building Services had no hesitation in using an ARDEX System for this project.
Unique Elements:
Without doubt, ARDEX WPM 002 and WPM 405 were the two key products that made this project such a success. However, ARDEX does not believe that their responsibility ends with the manufacture of innovative and specialist solutions. ARDEX’ Sales Representative, Brett O’Loughlin, provided Bravada Building Services with technical support before, during and after the installation. The support provided from the ARDEX Team, including in-depth training on a huge variety of products and techniques all influenced the outcome of this installation.
โครงการเพิ่มเติมใน สเตเดียมและสนามกีฬา
-
Quang Ninh Stadium – Vietnam
Quang Ninh Stadium – Vietnam
-
Box Hill Pool Refurbishment
ARDEX waterproofing and tiling systems used in Box Hill pool refurbishment.
-
Water Playground – Elizabeth Quay, Perth
Complete ARDEX system chosen as part of Elizabeth Quay Development
-
Trocadero at Hamer Hall, Melbourne
Concert hall venue requires resilient flooring surface
-
The Pool of Reflection, Sydney
Complete ARDEX system used for restoration works at Hyde Park memorial
-
Opera House Western Foyer, Sydney
ARDEX adhesive, grout and primer used at Sydney Opera House
-
St Barnabas Church, Sydney
Rebuild of 150 year old church utilises ARDEX Flooring system
-
Springs Day Spa & Fitness Centre, Noosa
Top performing ARDEX materials chosen for large scale upgrade
-
Lightning Ridge Olympic Pool
ARDEX tiling system specified for pool complex renovation
-
RACV Royal Pines Golf Resort, Gold Coast
An ARDEX TPO membrane was used to cover a roof area of 600 square metres
-
Cumberland Resort Lorne
ARDEX TPO membrane has been used to repair seriously degraded roofing
-
Q1 Surfers Paradise, Brisbane
ARDEX tile adhesives, soundproofing requirements, grouts and floor leveling were used in this residential tower
-
The Vibe Hotel, Canberra
5000 sq. metres of ARDEX tile adhesive was used for The Vibe Hotel