Challenge:

  • 200 m2 installation area
  • Four – day installation time frame
  • Store located on ground level with risks for moisture in slabs
  • Multiple trades on the job site

Situation:

H&M Singapore was opening a retail space in the Kallang Wave Mall within Singapore Sports Hub. The distance from the subfloor to the finished floor top level was more not level. The store was located on the ground floor of the mall putting it at issues. Tile installers, heating, vent and air conditioning installers and painting trades functioned simultaneously and had to complete work in four days.

Solution:

To remedy the uneven subfloor, Coating and Lining Technologies used ARDEX A 35 Rapid Set Screed Cement to create an unbonded surface. ARDEX A 35 Rapid Set Screed Cement provides an instant floor, receiving most finished floor materials after only 24 hours. ARDEX A 35 can also be installed as an unbonded screed layer without warping risk. Next, ARDEX R2SE Solvent Free Epoxy Primer was used to seal the substrate preventing air coming out from cement screed pores. ARDEX R 25 SE Self-Smoothing Epoxy coating was installed at varying thicknesses of 2 to 3 mm with no blistering or air bubbles. ARDEX R 25 SE combines outstanding wearing properties with chemical resistance and decorative properties. Ideally suited in areas where a seamless, joint free finish is required and maximum cleanliness is essential.