Lightning Ridge, well known amongst Australians as the home of the black opal, is located nearly 800 kilometres from Sydney with an official population of around 3000 people. Earlier this year, the ARDEX NSW Sales Manager and NSW Key Account Manager made their way to the Lightning Ridge Olympic Pool Site. Both were excited about potentially being involved in this project and later worked with the tiling contractor to ensure the project ran seamlessly.
CHALLENGES:
There were various challenges that had to be overcome for this project to run to schedule. The indoor heated pool (25m by 33m) had a depth of 2.5 metres at the shallow end through to the middle and 5 metres at the deep end. The time frame was only two months, which in itself was a huge challenge. The pool had never been emptied since it was opened in 2011, so there were a lot of unknown factors, such as, how long would the pool take to empty, to dry out, how difficult would it be to get the old paint off, would anything happen to the overall structure of the pool when the water was drained and what tiles would be best for the project.
PROJECT REQUIREMENT:
To complete the project from beginning to end in two months – empty; repair; tile; refill; treat water; choose a tile that would look great but at the same time suit a commercial heated pool; and a tiler who could work within the two month timeframe.
UNIQUE ELEMENTS:
The complex’ staff were able to purchase Italian glass tiles for the project which look outstanding and give the pool a contemporary look. In addition, the tiler and his team who completed this project were town locals.
To date, a children’s 200 sqm pool and the diving pool spanning 1200 sqm have been tiled.
ARDEX provided a System for the project that included ARDEX X 18, a superior polymer tile adhesive for wall and floor because of its extended open time and non-slump benefits.
In addition, ARDEX E 90, a synthetic dispersion additive provided a water repellant mortar for the two pools.
The grout used was ARDEX FG 8, a flexible coloured grout for tile joints 1 – 8mm wide,in addition to ARDEX Grout Booster that provided improved adhesion, strength and flexibility.
More projects in Sports Venues
-
Quang Ninh Stadium – Vietnam
Quang Ninh Stadium – Vietnam
-
Box Hill Pool Refurbishment
ARDEX waterproofing and tiling systems used in Box Hill pool refurbishment.
-
Water Playground – Elizabeth Quay, Perth
Complete ARDEX system chosen as part of Elizabeth Quay Development
-
Trocadero at Hamer Hall, Melbourne
Concert hall venue requires resilient flooring surface
-
The Pool of Reflection, Sydney
Complete ARDEX system used for restoration works at Hyde Park memorial
-
Opera House Western Foyer, Sydney
ARDEX adhesive, grout and primer used at Sydney Opera House
-
St Barnabas Church, Sydney
Rebuild of 150 year old church utilises ARDEX Flooring system
-
Springs Day Spa & Fitness Centre, Noosa
Top performing ARDEX materials chosen for large scale upgrade
-
Lightning Ridge Olympic Pool
ARDEX tiling system specified for pool complex renovation
-
RACV Royal Pines Golf Resort, Gold Coast
An ARDEX TPO membrane was used to cover a roof area of 600 square metres
-
Cumberland Resort Lorne
ARDEX TPO membrane has been used to repair seriously degraded roofing
-
Q1 Surfers Paradise, Brisbane
ARDEX tile adhesives, soundproofing requirements, grouts and floor leveling were used in this residential tower
-
The Vibe Hotel, Canberra
5000 sq. metres of ARDEX tile adhesive was used for The Vibe Hotel