Oracle Apartments, Broadbeach
INSTALLER: BAT Tiling
BUILDER: Niecon Developments Pty Ltd
ARCHITECT: Niecon Developments Pty Ltd.
CHALLENGES:
– One 40 level and one 50 level tower
– Mixed use development
– Multiple tile applications
PROBLEMS:
As part of a redevelopment plan to turn Broadbeach into a high-end ‘live-work-play’ destination, an $850 million investment was provided to build two modern towers, the Oracle Broadbeach Apartments. Niecon Development specified ARDEX products as the solution to this challenge. In doing so, they received complete peace of mind knowing ARDEX tile adhesives are high quality products compatible with marble, vitrified and ceramic tile.
SOLUTION:
BAT Tiling worked with ARDEX Australia to offer a SYSTEMARDEX solution. SYSTEMARDEX is a complete regiment of high quality, compatible tiling, flooring and waterproofing products matched with unparalleled technical and field support. Each product is engineered through meticulous research and developed with feedback from contractors, specifiers, manufacturers and clients.
Starting with one of the markets fastest drying acrylic membranes, installers applied ARDEX WPM 002 Superflex Bathroom and Balcony Two Part Waterproofing Membrane where needed. WPM 002 specifically addresses internal moisture issues under tiles. Because WPM 002 is microfiber reinforced, a reinforcing mat is not needed In non-exposed permanent immersion areas.
Once the waterproofing membrane was sufficiently dry, screeds were placed throughout the building. To ensure the screeds would have strong bonds, high shears and tensile strengths ARDEX Abacrete Bonding Agent was addedAbacrete is a non-toxic liquid polymer additive designed specifically for use with screeds and renders. This additive also improves water resistance in the flooring.
To ensure the tile adhesives would bond appropriately to the substrates, ARDEX Multiprime Water-Based Primer was recommended. Multiprime is easy to apply using a sponge, brush or roller. This process saves time and creates a strong bond between the screed and adhesive. Where necessary, ARDEX Abaflex Premium Polymer Modified Flexible Tile Adhesive was applied, and ARDEX DS 40 Impact Sound Reduction and Decoupling system was placed. Abaflexs’ eight-hour cure time allows contractors to quickly move forward with the project. Abaflex is a good choice because of its flexibility in accommodating cracks (up to .9mm) created by building movement. DS 40 enhanced the luxury of the multipurpose building by reducing impact noise transfer from tenants above. DS 40 acoustic mats are pre-cut for easy application and can be placed over various substrates. DS 40 can also be directly tiled over using an ARDEX tile adhesive.
To accommodate the variety of tiles used in the building, ARDEX X 10 Flexible Non Slump Wall and Floor Tile Adhesive was recommended. X 10 is a polymer modified, cement-based wall and floor tile adhesive created with mastic properties ideal for all tile types. The mastic properties prevent sagging and movement in flooring and wall tile installation, maintaining the level of quality required by general contractors.
Once tiles were placed, ARDEX grouts were used as the final step. Where pigmented grout was required, ARDEX FG 8 Flexible Coloured Grout for Tile Joints 1 to 8 mm wide was used. FG 8 may be used on floors and walls and is easy to apply using a rubber trowel. Because it contains anti-mould agents and water repellents, the appearance and overall cleanliness of the rooms is easily maintained. FG 8 also cures to a smooth finish reducing the amount of trapped dirt and airborne contaminants.
Wherever a wider joint width occurred, ARDEX Wide Joint Sanded Cement-Based Grout was applied. This grout is shrink-resistant, and is especially suited for wider joints ranging from 5 to 15 mm. It can be used for floor or wall applications, around swimming pools and showers, and is available in a range of colours. For all carpeted areas, ARDEX AF 266 Outdoor Carpet Adhesive was recommended. This water-based adhesive has a low odor, so it is ideal for indoor use. ARDEX recommended this product, because it is resistant to the frequent, commercial grade cleaning expected in a luxury multi-purpose high rise.
Each of the products used for this project are part of the SYSTEMARDEX solution.
โครงการเพิ่มเติมใน งานกันซึม
-
The Bombora, Cronulla
SystemARDEX specified for high end apartment project
-
Box Hill Pool Refurbishment
ARDEX waterproofing and tiling systems used in Box Hill pool refurbishment.
-
The Elan, Sydney
Complete façade overhaul using SystemARDEX
-
MYER Shopping Centre, Cairns
ARDEX system specified for 10,000m of timber flooring to be laid at Myer Cairns.
-
Dubai Mall, Dubai
ARDEX System recommended for one of the largest retail shopping malls in the world - Dubai Mall.
-
The Hub Apartments, Richmond
The Hub was completed using a full System ARDEX solution.
-
Sandgate Apartments, 51 Ashburner St, Manly
ARDEX render and waterproofing system specified for unique, beach-side façade restoration.
-
Oracle Apartments, Broadbeach
SystemARDEX specified in large redevelopment project.
-
University Hospital, Gold Coast
The new 750 bed hospital is one of the largest public health projects
-
Paediatric Hospital, Melbourne
World-class paediatric hospital went under construction in Melbourne
-
Airport, Newcastle
1600 sqm of natural stone laid using ARDEX adhesives
-
Water Playground – Elizabeth Quay, Perth
Complete ARDEX system chosen as part of Elizabeth Quay Development
-
The Pool of Reflection, Sydney
Complete ARDEX system used for restoration works at Hyde Park memorial
-
Springs Day Spa & Fitness Centre, Noosa
Top performing ARDEX materials chosen for large scale upgrade
-
MYER Building, Launceston
ARDEX TPO roofing membrane used to repair leaking roof at the Myer building
-
Residential Apartments, St Peters
500sqm of ARDEX TPO used to fix leaks
-
One Eleven St Georges Terrace, Perth
Replacement of waterproofing membrane
-
Old Parliament House, Canberra
ARDEX products were specified and used throughout the project
-
Lure Apartments, Nelson Bay
ARDEX sound proofing system used in new prestigious development
-
Elevation Apartments, Perth
ARDEX System used in prestigious development right in the heart of Perth’s CBD
-
RACV Royal Pines Golf Resort, Gold Coast
An ARDEX TPO membrane was used to cover a roof area of 600 square metres
-
Cumberland Resort Lorne
ARDEX TPO membrane has been used to repair seriously degraded roofing
-
Te Wharewaka O Poneke, Wellington
1000 sq. metres of 1.5mm Dark Grey Butynol® was used for this significant arts venue.
-
The University of New South Wales, Sydney
An ARDEX TPO Roofing Membrane was used for a 1500 sq. metre roof area
-
Science Centre, Brisbane
The ARDEX range of compatible technologies were used in this major redevelopment